Problem, approach, outcome. No project is included here unless we can describe what actually happened.
5 projects
Structural and piping engineering for a seawater cooling system inside Tata Steel's ultra-low-carbon programme, delivered across 2023-26.
Feasibility and basic design of a new steel plant covering material handling, cooling, utilities and CAPEX, supporting the investment decision on the move to electric arc steelmaking.
Structural analysis, safety review and a new layout concept to optimise production flow and meet regulatory requirements, in a workshop that stays in production.
Basic and detail engineering of EAF tapping, shell transfer and empty ladle transfer cars, together with a steel shop ladle.
A complete digital twin and simulation of an aluminium recycling plant, used to validate the design before commissioning.